#309 Capturing Industrial Well Water Residuals with a Geotube®

This industrial site was required to pump 250-gpm of water non-stop from a well on site. Caustic was added to raise the pH of the water from 4.6 exiting the well to 6.5 when it entered a waterway. This caused metals to precipitate and release into the waterway. A Geotube ® dewatering system has successfully captured the metals to put this industrial site in compliance and avoid violations to the discharge regulations.

Comments are closed.