#321 Dewatering Residual from Refineries Fire Water Pond

Thirty years of process water entering a 5 acre pond resulted in a serious 3 to 10 foot buildup of solids at this refinery.  Plant operators needed a process of removing the residual that would not damage the integrity of the banks of the pond or the liner.