WaterSolve was contracted to provide personnel, dredging, equipment and products for a refinery that had to empty a lagoon and its residuals. Over 25,000 cubic yards of residuals were removed from the lagoon and dewatered to pass the paint filter test.
Solutions For:
Products & Equipment:
Downloads:
