#316 Dredging and Dewatering Contaminated Creek

Removal of PCB laden creek:  The objective was to dredge and dewater the sediments from the creek. Due to the various depth changes in the creek the contractor used a raft for the hydraulic pump, and the workers used suction hoses to remove the residual.  