#318 Dewatering Iron Backwash Residuals from WTP

A Wastewater Treatment Plant in New York is responsible for handling iron waste from their multiple facilities.  In order to process the iron waste, the water treatment plant had to backwash 25,000-50,000 gallons of residual to settling ponds located on site. These settling ponds became saturated with iron backwash residual.

Comments are closed.