The drying beds at this California wastewater treatment plant were not keeping up with the output of the plant. Facility managers selected Geotube® dewatering containers for their low cost and high flow rate to get the plant caught up. A WaterSolve, LLC technician arrived on site and had the process running 3 hours after his arrival. At the end of one week the managers reported they had processed the equivalent of 5 drying beds into one 45′ circumference by 100′ long Geotube®. They now use Geotube® containers whenever they get behind.
Solutions For:
Products & Equipment:
Downloads:

WaterSolve honored as one of the 2012 Michigan 50 Companies to Watch!
Mexico Uses TenCate Geotubes® to Prevent Beach Erosion
More details on the Alameda Seaplane Lagoon
WaterSolve works on Navy dredging project at Alameda Seaplane Lagoon