#343 Dredging a Refineries Waste Water Pond Residual into Geotube® containers

The operators at this refineries wastewater plant were rapidly running out of room in the settling pond. A dredge was pumping material to a centrifuge and production was not keeping up with the loading of the pond. The objective was to speed up the process and quickly get more space in the pond so they wouldn’t have to stop production in the refinery.

 

Comments are closed.